2026-10
- Why Your Factory Says 45 Days When the Buyer Wants 20
Only about 15 of those 45 days are production. The other 30 are waiting—for approvals, materials, scheduling and vessels. Here are the four waits worth cutting.
- Dev Log #002: Treating the Directory as the Architecture
Architecture is not a diagram: it is directories, guards, ports and contracts. How a 1+6+1 skeleton was frozen, and what a behaviour-neutral refactor tests.
- Dev Log #001: Why I Built a Content Factory (and What the First 35 Days Actually Cost)
35 days, 620 commits, 18 active days, about USD 25/month in model calls. In-house is not about saving money — it is about control. Three incidents included.